The validation build starts
Our 200-unit engineering validation build is starting with checks for assembly, weather exposure and radio range.
Now: Engineering validation buildShips April 2027
What we built, what broke and what changed, in the order it happened.
Our 200-unit engineering validation build is starting with checks for assembly, weather exposure and radio range.
Reservation deposits stay in a separate account and will fund only the first production run's parts order.
We have ordered the steel moulds for Stake and set aside time to check the first moulded parts.
The third solar cap changes the thread, seal and assembly after two earlier enclosures failed outdoors.
Forty prototypes in twelve gardens exposed cracks, trapped moisture and weak radio connections.
Our first bench probe reads soil at two depths so we can see what watering reaches.